The area of refit was cleaned up completely. Old walls and ceiling was refreshed.. A new concrete floor was laid with new carpet and tiling. A new wine shop with its furnishings was built. A new bar and a buffet breakfast area were built. The restaurant got a new ceiling with new lighting. All new furniture was delivered and installed.
Duration of the project: 12 days, 30 men in two shifts, total area 190m2, Naantali.
The area of refit was cleaned up completely. Old walls and ceiling was refreshed. A new concrete floor was laid with new carpet and tiling. All kitchen equipment was replaced and a new service area was built. Delivery and installation of new furniture and lighting.
Duration of the project: 12 days, 25 men in two shifts, 145 m2., Naantali.
The service area was refreshed, which got completely new equipment and furniture.
A new canopy was installed to the existing bar. The walls of the bar were refreshed by installing new decorative covers. a new steel fence was also installed to separate the bar and promenade.